Michigan B184 Update August 13, 2004

Back to B184 updates * Previous * Next


1) Chambers passing CR test
 
  a) Chambers passing CR test this week: EMS4A04, EMS5C10, EMS4C08

    The tube with a blind tubelet has been repaired and it works fine
    now, except the drift time is longer than the others due to insufficient
    gas flushing.

  b) Total number of chambers passing CR test at CERN:   49
 
2) Chambers in progress

  EMS4A08: Ready for CR test this afternoon
  EMS4A06: Epoxy done, survey target, B sensor platform glued.  Will
    move back to the station for leak test.
  EMS4A10: Just arrived

3) Chambers in hospital.

   EMS5A04 (5th Michigan chamber): [ from last report: leaks are
   found in the location between Al ring and endplug for almost all
   tubes of both RO and HV sides.  Previously we had 4 such 
   chambers). This chamber failed long term gas leak tightness.  We
   decided to apply epoxy to the leak location for ALL tubes. We did
   careful cleaning before applying epoxy]
                 
   The leak rate is still above 10mbar/day for helium, The leaks are
   still from the location between AI ring and endplugs.  We decided
   to reapply epoxy to some tubes which have high leak rate (a few x
   10^-5 ml/sec), though, by eye, the epoxy was well applied to the
   location.
                 
   EMS5A06: Higher dark current found in bottom multilayer, as I have
   specially reported one or two days ago. We have done a few rounds
   of cleaning and measuring dark current. Now the dark current
   dropped to about 2000 nA at RH=62%.  Hopefully it will reach ATLAS
   specification at RH=45%. 

4) Problems and other issues
 
  a) Parts.  UW has been doing their inventory and some counts have
  become clear.  After returning what they borrowed from UM, both
  sites feel now much more comfortable.  Both sites are short of only
  one piece of FC (82040602), and are not short of Mezz card
  covers. This is completely different picture as compared to last
  week, when they told us that they didn't use so many parts from UM,
  which worried me a lot.
         
  We are still waiting for survey targets, which have been sent from
  Jim Bensiger.  We have about 80 mezz cards left which will only keep
  us going for only one week. so it's urgent to have mezz cards.  We
  received 256 mother board from Bernard.  Claudio, please confirm
  this number.
         
  We got two DCS boxes from Matt which were mounted to chambers. I
  keep requesting DCS boxes from Matt.
         
  b) Problem with blocked tubelets.  We found one blind ET (no hole on
  ET), and one blind US stainless steel tubelet.  It took lots of our
  time to identify these two guys.
         
  When changing the blind tubelets, the Mezz cables were swapped. We
  found the error from the hitmap of CR data.  Both mezz caps and mezz
  cables are numbered, for the purpose of connecting them correctly.
  I wish we all could pay great attention to each step, and check what
  you did before moving to the next step.

  c) Visiting Russians.  Two Russian colleagues are working with us as
  volunteers to get experience working on chamber integration and
  testing. They will then work on their own chambers some time next
  year at bldg184. They are actually quite experienced physicists, I
  feel.

Zhengguo Zhao