Michigan B184 Update October 1, 2004 |
Back to B184 updates * Previous * Next
1) Chambers passing CR test
a) Chambers passing CR test this week: EML5A13, EMS5A14, EML3A03
b) Total number of chambers passing CR test at CERN: 68
2) Chambers in progress
EML5C01: CR data taking
EML5C09: Dark current test
EMS5A12: (This chamber is the one that had been in truck at UM bay
for CR test.) Replaced ET's, recertified the chamber. will be ready
for CR data taking after gluing B sensor platform
3) Chambers in hospital. none
4) Problems and other issues
We received toner for our laser printer. thanks to Shawn, Beth, Bob
and all who made it available to us fast.
a) We have finished the last UM chamber (EML3A03) in terms of
chamber integration and test. And are working with these that need
to be retested, first EML5 chambers.
b) We also started to work with UW chambers, mainly apply epoxy to
their chambers at this stage.
c) We still need to make effort to make the 4th DAQ system
working. as expected, our speed is now largely depend on how fast we
can do the CR test.
Attached is a file of spreadsheet. They are:
1. Chamber integration status
2. Summary of comments to the chambers
3. Chambers that need to replace Mezz cards, HV connectors, and
install/modify DCS box. I'll have to recheck these spread sheets at
some point. However, these spreadsheet more or less tell us our
status and the chambers that need to be redone. We will first only
move chambers that need to replace Mezz cards back to bldg 184.
Zhengguo Zhao