Definitions of the numbers listed in Summary table:
N(total) = number of chambers to be worked or reworked at CERN in phase I
N(finished) = number of chamber that have been finished
N(this week) = number of chamber finished this week

1.  Summary table

              N(total)           N(finished)           N(this week)
UM             80                   80                        0             
BMC            80                   12                        4
UW             80                   71                        4
-------------------------------------------------------------------
Total         240                  163                        8
                                                                 
2. Chambers finished this week: 

  UW:    EML1A13, EML1C05, EML1C09, EML2C13
  BMC:  EMS1C02, EMS1C08, EMS1C10, EMS1C14

3. Chambers in progress

  UW chamber
    EML1A11:  taking cr data
    EML1C15:  flush gas and then dark current test
    EML1A05: Dark current test, T sensors and inplane system tested
    EML1A15: Dark current test. Dealing with tubes with higher dark current. 
    EIL4A03:  Last week we reported:
     "Tube ML1-3-54 has dark 30-150 nA, leading hot channel in CR
     data.  Delt with -HV=3200 V for over night, applied HV=3100 V for
     three days, replace tubelets.  DC stays. We will keep HV=3200 V
     till sunday or monday, then retake cr data."

     This tube was cured after applying HV=3200 V over
     weekend. However, the second run of cr data show that this tube
     is no longer hot.  However, the other two tubes appeared to be
     hot. Negative HV over night does not help reducing the dark
     current of these two tubes. We now decide to apply HV=3200-3400 V
     over weekend.

     This chamber has been in hospital for over two weeks. 

  BMC chambers
    EMS1C16: ready for taking cr data.
 
  UM chamber
    EML4A07: Test finished. Chamber is still keep on rotator. Curtis
      is analyzing the data and doing some tests.  

4. Problems and other issues

  a) ML1-3 tripped at HV=1.6 kV, and the reason was found to be a
     fiber bridging signal cap and ground pin.  Problem was soon fixed
     after tracing to the tube by opening FC.  

  b) EML1A15 has a few tubes with slightly high dark current (100-300
     nA/tube), we are dealing with them.

  c) EML1A05 has also unstable slight high dark current and we will
     pin down to the tubes and then treat them.

  d) According to our estimation, we will finish all UW chambers and
     the 20 BMC chambers at CERN around the end of this month.  We are
     waiting for the 4 chambers from H8.

  e) Its almost another 6 months I have been absent from USA and I
     have to go back to Michigan so that my green card could be valid.
     I'm leaving CERN for Ann Arbor tomorrow and will return to CERN
     on March 18. During my absence,
     - Paul and David will continue reporting you weekly. 
     - David will take care of chamber movement. In case he is not
       available, Bingyun will take care of it, with Paul or Matt
       around.

  f) We once more call everybody's attention on the safety
     issue. Please strictly follow our policy while working in
     bldg184. We would like to emphases
      - follow the traveler to work for your chamber
      - don't box chamber alone
      - while dealing with HV, MAKE clear sign "HV ON" around the
        chamber
      - while moving chamber in bldg184, help watch out safety.
      - check  HV, gas system before going home.    

Zhengguo and David