Michigan B184 Update May 20, 2005 |
Back to B184 updates * Previous * Next
Definitions of the numbers listed in Summary table:
N(total) = number of chambers to be worked or reworked at CERN in phase I
N(finished) = number of chamber that have been finished
N(this week) = number of chamber finished this week
1. Summary table
N(total) N(finished) N(this week)
UM 80 80 0
UW 80 80 0
BMC 80 60 6
-------------------------------------------------------------------
Total 240 220 6
2. Chamber finished this week:
BMC:
EIL1C07, EIL1A09, EIL2A07, EIL2C07, EIS1A14, eis1c02
3. Chambers in progress
BMC chamber
EIL1C03: taking cr data
EIS1C12: taking cr data
EIS1C06: measure gas leak rate, T sensors and inplane system
tested
EIL2C11: measure gas leak rate, T sensors and inplane system
tested
EIS1A10: measure leak rate, test T sensors and inplane system
EIL2C09: gas flushing, test T sensors, inplane system
UW:
4(rather than 8, as reported before) BIM chambers that will be
attached to EIL4 Gas leak certification of the chambers.
4. Problems and other issues
a) A dead channel was found due to Mezz card problem. after
replacing Mezz card, "dead" channel is saved. in total, we have had
2-3 such a kind of mezz card, a very small fraction of the total
cards used for US chambers.
c) Russican group also worked out two chambers. Their chamber
quality seem pretty good so far. Their chamber intergration and test
is now following the same standard as US's. US group is a great help
to them, I think.
Zhengguo and David
Back to B184 updates * Previous * Next *