1. Phase 1
- EIS1A08: finshed phase 1. After doing the photogrammetry, phase
1.9 will be done then.
- The last 5 BMC chambers were unloaded in B184.
- We are keeping EIL2A13/C03 in B184 for T0 study.
UW:
Four BIM chambers: still waiting for HV cards from Italy.
2. Phase 1.9 - 41 chambers have passed so far
Following chambers have been finished
EML1C01, EML1C03, EML2C03, EML2C15
Zhengguo and David